273. The owner of a bulk plant must ensure that
(1)  the receiving tank of the installation is designed to hold the volume intended for it;
(2)  the grounding device of the tank is connected to the cargo tank before a petroleum product is transferred into an aboveground tank; and
(3)  the ventilation of the tank is satisfactory and that there is no leak in the supply line during the transfer of a petroleum product.
O.C. 221-2007, s. 1.